Date de publication: 17 octobre 2024
Promoteur – Intermédiaire Financier
STAD LEUVENLieu
Description
The project consists in a Framework Loan (FL) to support the multi-sector investment plan of the City of Leuven, including the implementation of its urban regeneration and climate city strategies.
Objectifs
The aim is to finance multi-sector urban development schemes in Leuven, in particular the refurbishment and upgrade of public buildings including Energy Efficiency (EE) and Renewable Energy (RE) measures, open public spaces and green areas, sustainable mobility schemes, urban renewal and new infrastructure, public lighting, affordable housing, school refurbishments and cultural heritage buildings.
Secteur(s)
- Aménagement urbain - Construction
Montant BEI envisagé (montant approximatif)
EUR 150 million
Coût total (montant approximatif)
EUR 414 million
Aspects environnementaux
The promoter's environmental management capacity to properly apply the relevant EU Directives will be verified during appraisal, particularly with regard to EU Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC, EU Energy Performance of Buildings Directive EU/2010/31 and Energy Efficiency Directive EU/2023/1791 as revised in 2023, and the Urban Waste Water Treatment Directive (91/271/EEC). The status of environmental studies and public consultations related to the construction and refurbishment investments will also be further assessed during project appraisal. The schemes under the Framework Loan should have an overall positive impact on the environment by promoting sustainable urban development and reducing energy consumption. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, climate adaptation, transition to circular economy, and pollution prevention.
Passation des marchés
The promoter shall ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directives 2014/24/EU and 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EE] as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 18/12/2024
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).