    Référence: 20230523
    Date de publication: 26 janvier 2024

    Promoteur – Intermédiaire Financier

    TEAG THUERINGER ENERGIE AG

    Lieu

    Description

    The project consists of an investment programme for electricity distribution in the period 2024-2028, including the renovation, reinforcement and extension of distribution infrastructure, the renovation and digitalisation of network control systems and the installation of smart meters.

    Additionality and Impact

    The project concerns standard electricity network investments in a regulated natural monopoly.


    The promoter's CAPEX plan includes investments in electricity distribution and metering. The project will contribute to maintaining or increasing security of supply in the context of growing electricity demand, from heating and mobility in particular, and growing integration of electricity production from RES.


    The Programme is expected to contribute to Bank's lending priority objectives on Climate Action and Environmental Sustainability and it aligns with the REPowerEU objectives. The financing of the Programme will contribute to the Bank's ELP themes on Securing the Enabling Infrastructure (energy networks) and Innovative technologies and new types of energy infrastructure (smart meters).


    The operation addresses a number of desired results, including maintaining security of energy supply, and the integration of low-carbon generation, which reduces carbon emissions and air pollution, with positive climate and health externalities. Smart technologies allow energy consumers to receive more granular and closer to real time information, thereby enabling demand response to price signals.


    The project is expected to deliver excellent economic benefits and excellent social benefits. The promoter is experienced in works of this nature and has a sound project management system in place.


    In financial terms, the EIB loan is expected to allow the borrower to diversify its funding sources (with first time financing from EIB) at attractive financial conditions, with a long term (25 years) and grace period (3 years), reflecting the average economic life of the assets and the time for project's construction/implementation. The EIB loan also allows a high flexibility in use of the line, with limited commitment fees over a 4 year availability period. In non-financial terms, the granting of the EIB loan is considered to have a positive signalling and catalytic effect.

    Objectifs

    The project caters for demand growth, the connection of network users, the rollout of smart meters, the integration of renewables, and the improvement of the quality of service and the efficiency of operations.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 400 million

    Coût total (montant approximatif)

    EUR 591 million

    Aspects environnementaux

    The project includes components that may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected for some schemes relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC).

    Passation des marchés

    The EIB will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 11/04/2024

    Milestone
    À l'examen
    Approuvé
    Signé
    1 mars 2024
    11 avril 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).