Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20230688
Date de publication: 4 février 2025

Promoteur – Intermédiaire Financier

ACA SPA IN HOUSE PROVIDING

Lieu

Description

The loan will finance the promoter's investments in integrated water services in the Italian region of Abruzzo from 2024 to 2026.

Additionality and Impact

The Project is in line with the InvestEU objective of Environment and Resources. The Project will support investments in water and wastewater infrastructure in the Abruzzo Region in Italy, by improving the coverage and quality of integrated water services, and bringing operational efficiency improvements, as well as increasing resilience towards droughts. In doing so, it will also ensure compliance with key European regulations in the water sector. Being located in Abruzzo, a transition cohesion region in Italy, the Project will contribute to the EU's economic social and territorial cohesion.


The Project will contribute to the Bank's policy objectives of Sustainable Energy and Natural Resources as well as Climate Action and Environmental Sustainability. The Project will address a number of market failures, including those associated with public goods, unaccounted for externalities and information failures, generating positive health, environmental benefits and water security (including resilience against climate change), which would not be realised to the same extent without public intervention.


Given the counterpart's relatively small size and low capital levels, the EIB would not be able to provide financing support to the same extent without InvestEU. The EIB support is expected to bring a tangible value added by lowering the project's cost of funding and offering a tenor longer than the one normally proposed by other financers. Considering the magnitude of the Project's funding needs, it is expected that the EIB support will contribute to accelerate its implementation.


Objectifs

The aim is to support the upgrade of water and wastewater infrastructure (e.g. water and wastewater treatment plants, sewerage networks, and energy efficiency).

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 30 million

Coût total (montant approximatif)

EUR 151 million

Aspects environnementaux

The upgrade of water and wastewater infrastructure brings positive environmental impacts. Compliance with the EU Water Framework Directive (2000/60/EC), Urban Waste Water Treatment Directive (91/271/EEC) and EU and national environmental legislation, notably under the environmental impact assessment (EIA) Directive 2011/92/EU (amended by the Directive 2014/52/EU), Birds Directive (2009/147/EC) and Habitats Directive (92/43/EEC) will be verified during appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation and mitigation, as well as water and marine resources protection. It will deliver notable health benefits and enhance environmental quality for the local population, thereby improving the overall quality of life in the area. Any potential social negative impacts such as occupation of public and private spaces, safety hazards during construction, traffic, and noise, will be addressed as part of the planning for the implementation of each scheme. The promoter has demonstrated sound practices concerning environmental, health and safety management. As per social matters, the promoter will also be requested to comply with the relevant applicable legislation.

Passation des marchés

The promoter has to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/23/EU and/or 2014/24/EU and/or 2014/25/EU where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 29/01/2025

Milestone
À l'examen
Approuvé
Signé
11 novembre 2024
29 janvier 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Eau, assainissement