Date de publication: 5 février 2024
Promoteur – Intermédiaire Financier
METROPOLE ROUEN NORMANDIELieu
Description
The project will finance the renewal of 128 buses of the Rouen Métropole public transport network with zero-emission vehicles, the electrical retrofit of 49 school buses and coaches as well as and the upgrade of the ticketing and operation system. Among the 128 buses, 14 will be standard hydrogen buses (12m), 70 will be electric articulated buses (18m) and 44 will be standard electric buses (12m). Implementation will happen in the period 2023-2026.
Objectifs
The project aims to improve the quality and environmental sustainability of the public transport service by shifting the bus fleet of Rouen Métropole, including the fleet used for school services, to zero emissions technologies. The investments are expected to contribute to the objective of sustainable urban transport and climate change mitigation. The project should improve the attractiveness of public transport services and consequently reduce dependence on private cars. As a result, it should contribute to the reduction of environmental pollution from transport in terms of air and noise pollution, road accidents and global warming. Furthermore, it should bring benefits in terms of improved accessibility to places of study and work.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 50 million
Coût total (montant approximatif)
EUR 131 million
Aspects environnementaux
Manufacturing of vehicles does not fall within the scope of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU, therefore no EIA is required for this component. Also the depot upgrade and equipment to charge the buses are not expected to fall under the EIA Directives and this will be further confirmed during the appraisal. The project is expected to have a positive environmental impact by reducing noise and air pollution. Furthermore, the project should contribute to reducing the GHG emissions.
Passation des marchés
The EIB will require the promoter to confirm that contracts for implementation of the project were tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU , Directive 2014/24 as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 15/04/2024
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).