Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20230892
Date de publication: 23 août 2024

Promoteur – Intermédiaire Financier

REPUBLICA DE COSTA RICA

Lieu

Description

Electrification and rehabilitation of a rail corridor comprising of two lines and about 50 km across the metropolitan area of San Jose de Costa Rica to run tram-train services. The project is a flagship initiative of the Global Gateway Investment Agenda.

Objectifs

The EIB operation aims to finance the electrification, rehabilitation, and upgrade of the railway system of the great metropolitan area of San Jose (Costa Rica) as well as the acquisition of new electric trains. The project is a flagship initiative of the Global Gateway Investment Agenda. Co-financing with the Central America Bank of Economic Integration (CABEI) and the Green Climate Fund (GCF), the project will optimise frequencies, electrify and rebuild infrastructure, improve crossings, modernise tracks, signalling, crossing areas or traffic control systems which in turn will improve the quality of life of the population of the metropolitan area with modern, accessible, and safe transportation.

Secteur(s)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

USD 250 million (EUR 238 million)

Coût total (montant approximatif)

USD 1040 million (EUR 991 million)

Aspects environnementaux

If it were located in the EU, the project would fall within the scope of Annex I of the EIA Directive. A preliminary Environmental and Social Impact Assessment (ESIA) in order to identify the key environmental and social risks was completed in accordance with the national legislation of Costa Rica. Concerning the social impacts, the project may require resettlement of some households and businesses. Project impacts, compliance of the performed ESIA with the EIB Environmental and Social Standards, the need for further assessments to complement it, as well as the need for a Resettlement Policy Framework and/or Resettlement Action Plan will be analysed during appraisal. The project's key Environmental and Social documents will be published in line with the Bank's procedures. Overall, the project is expected to contribute to climate change mitigation and pollution prevention. The project is also expected to bring social benefits in terms of improving mobility, especially for people without access to motorised private transport.

Passation des marchés

The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Statut

À l'examen - 7/05/2024

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Costa Rica Transports