Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20230905
    Date de publication: 4 septembre 2024

    Promoteur – Intermédiaire Financier

    IGNIS DESARROLLO SLU

    Lieu

    Description

    The project consists of the construction and operation of six photovoltaic PV plants in Spain, totalling circa 297 MWp.

    Objectifs

    The project will contribute to progressing on the national and EU energy and climate goals, namely helping to decarbonise electricity production in the EU and to decrease the reliance on fossil fuels. Some of the plants are located in EIB Cohesion Priority Regions, and contribute to developing less-developed and transition regions.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 79 million

    Coût total (montant approximatif)

    EUR 193 million

    Aspects environnementaux

    This project is intended to generate environmental benefits by supporting ground based solar PV plants that help mitigate climate change. The individual plants and most of the ancillary infrastructure fall under Annex II of the EIA Directive 2011/92/EU amended by the Directive 2014/52/EU. Overhead transmission lines for the interconnection of the schemes to the grid, if falling under the Annex I due to their technical characteristics, will be expected to be subject in all cases to an environmental impact assessment (EIA) process. During appraisal, the Bank will assess the capacity and capability of the promoter to implement the Project and its compliance with applicable EU Directives.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require the promoter to apply those rules.

    Statut

    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Énergie