Date de publication: 22 avril 2025
Promoteur – Intermédiaire Financier
MUNICIPIO DE OEIRASLieu
Description
The OEIRAS URBAN RENEWAL project consists of the Multi-annual investment plan (2025-2029) of the Municipality of Oeiras in Portugal. It includes the development and enhancement of social infrastructure, such as educational facilities, social housing, care facilities and public buildings. Additionally, the project focuses on the renovation and improvement of open spaces and green areas, as well as the modernisation of urban roads.
Objectifs
The aim is to contribute to further developing the Municipality of Oeiras and improving both its living and business conditions. The project will improve urban mobility and foster economic development, considering the changes in demographic and economic conditions.
Secteur(s)
- Aménagement urbain - Construction
Montant BEI envisagé (montant approximatif)
EUR 80 million
Coût total (montant approximatif)
EUR 170 million
Aspects environnementaux
The compliance with the relevant EU Directives will be verified during appraisal: Directive 2011/92/EU as amended by the Environmental Impact Assessment (EIA) Directive 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. For new and refurbished buildings, the compliance with EU Directive 2010/31/EU on Energy Performance of Buildings will be further examined during appraisal. For schemes triggering art. 4.7 of the Water Framework Directive 2000/60/EC, the compliance with this WFD will be further examined during the appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, climate adaptation, pollution prevention, and protection and restoration of biodiversity and ecosystems. Finally, the project is expected to contribute to improve social inclusion, in particular through those schemes directly connected to mixed and integrated development as the ones on the social/affordable housing sector.
Passation des marchés
The EIB will require the promoter to ensure that contracts for implementation of the Project have been or will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/24/ EU / 2014/25/EU as well as Directive 92/12/EEC or Directive 89/665/EEC as interpreted by the EU Court of Justice, with publication of tender notices in the EU Official Journal, as and where required.
Statut
À l'examen - 31/03/2025
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).