Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    2.750.000.000 €
    Länder
    Sektor(en)
    Italien : 2.750.000.000 €
    Stadtentwicklung : 2.750.000.000 €
    Unterzeichnungsdatum
    16/06/2023 : 250.000.000 €
    7/09/2022 : 500.000.000 €
    26/06/2017 : 1.000.000.000 €
    9/03/2018 : 1.000.000.000 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    19 April 2017
    Projektstatus
    Referenz
    Signed | 26/06/2017
    20160810
    Projekttitel
    Projektträger – Finanzintermediär
    LAZIO UMBRIA MARCHE EARTHQUAKE RECOVERY
    REPUBBLICA ITALIANA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 2750 million
    EUR 7096 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    This framework loan will partially support the reconstruction and restoration of private residential and mixed use buildings, industrial infrastructure and public buildings providing for education, legal and administrative services, affected by the earthquakes of August and October 2016 in the Lazio, Marche, Umbria and Abruzzo regions.

    The project will have wider economic benefits generated by the restoration of suitable livelihood, business conditions and public services that were hampered by the 2016 earthquakes and, where justified, upgrade the seismic resilience of rehabilitated or reconstructed buildings so as to reduce the risk of damages from future events of similar magnitude. Longer term measures, including seismic risk mapping and disaster preparedness studies, may be carried out within the framework of relevant international coordination bodies and will comply with the requirements of the national and EU regulatory framework. In addition, the rehabilitation, renovation and reconstruction of residential and business buildings will result in energy efficient improvements and increased use of renewable resources.

    Umweltaspekte
    Auftragsvergabe

    The main schemes will involve rehabilitation, renovation and reconstruction of private residential buildings, buildings used for productive activities and public buildings providing education and health services, among others, that were damaged by the earthquakes. Some of the individual schemes may fall under Annex I or Annex II of the EIA Directive 2011/92/EU or may be located within or in the immediate surroundings of Natura 2000 areas, protected under the Habitats Directive 92/43/EEC and the Birds Directive 2009/147/EC. Project impacts and related mitigation measures (if required) as well as regulatory requirements (EIA, SEA, Natura 2000 assessments) will be assessed during appraisal and/or allocation stages. New or refurbished public buildings will be required to comply with the provisions of the EU Directive on Energy Performance of Buildings 2010/31/EU.

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required. Other beneficiaries, i.e. businesses and households, have been assessed by EIB as being part of the private sector (not operating in the utilities sector and not having a status of a contracting entity), thus not being subject to EU rules on public procurement. However, if after the project appraisal the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (Directive 2014/24/EU or 2014/25/EU, where applicable), then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

    Link zum projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - LAZIO UMBRIA MARCHE EARTHQUAKE RECOVERY FL
    Datum der Veröffentlichung
    2 Nov 2017
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    74417074
    Thema
    Umweltinformationen
    Projektnummer
    20160810
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen