Unterzeichnung(en)

Betrag
45.000.000 €
Länder
Sektor(en)
Tunesien : 45.000.000 €
Energie : 45.000.000 €
Unterzeichnungsdatum
30/12/2023 : 45.000.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
2 November 2023
Projektstatus
Referenz
Unterzeichnet | 30/12/2023
20170028
Projekttitel
Projektträger – Finanzintermediär
STEG - TUNISIA ITALY POWER INTERCONNECTION
SOCIETE TUNISIENNE DE L'ELECTRICITE ET DU GAZ,TERNA - RETE ELETTRICA NAZIONALE SPA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 45 million
EUR 921 million
Ort
Sektor(en)
Beschreibung
Ziele

The project concerns the implementation of a High Voltage Direct Current (HVDC) link interconnecting Tunisia and Italy across the Strait of Sicily and the associated connections to the respective national grids. The HVDC link is designed as a monopole with sea return, nominal capacity of 600 MW, DC voltage of 500 kV and a total route length of 224 km, of which 200 km offshore. The offshore route crosses Tunisian and Italian waters. The project has been designated as part of the Global Gateway.

The project aims at developing cross-border trade of electricity between the EU and Tunisia, facilitating the deployment of renewables, and improving the resilience of the Tunisian power system to demand/supply mismatches, thereby contributing to support stable economic growth and the transition to a low carbon energy system.

Additionality and Impact

The Project will establish the first electricity interconnection between Tunisia and Italy through an HVDC submarine cable of about 200km between the Cap Bon peninsula (Tunisia) and Sicily (Italy). This cross-border infrastructure is a Project of Common Interest (PCI) and benefits from a significant CEF grant from the EU. It is part of the European Green Deal, REPowerEU and Global Gateway initiatives. The Project is aligned with the Team Europe Initiative (TEI) "Tunisia-Investment" as it will result in new economic infrastructure being constructed and will contribute to the transition towards decarbonisation of the economy. It will contribute to achieving national and EU long-term energy and climate goals. It supports the EIB priority policies related to securing the enabling infrastructure and to climate action objectives. The interconnection will enable cross-border trade of electricity between Tunisia and Italy - it will reduce generation costs and renewable curtailment in Italy and in the long run is expected to allow Tunisia to export renewables to Europe, thereby reducing environmental and climate externalities. The Project also addresses market failures by improving cross border coordination and contributing to security of supply under stress scenarios. Thanks to the reduction of generation costs and GHG emissions and by enabling integration of increasing shares of renewables curtailment, the Project is deemed to deliver very good economic and excellent social benefits. The governance of the Project will be improved via an EC funded technical assistance and is rated as fair. The employment impact of the Project is rated Fair, according to the Bank's methodology.

Umweltaspekte
Auftragsvergabe

The Bank will require the Promoter to comply with national legislation, relevant EU directives and principles and the EIB's Environmental and Social Standards.

The Bank will require the Promoter to ensure that the Project will be implemented in accordance with the Bank's Guide to Procurement.

Kommentar(e)

This operation falls under the Global Europe NDICI Mandate (Investment Window 1) - subject to the EC's confirmation of eligibility - and will benefit from the EU EFSD+ comprehensive guarantee on a fall-back basis. The project, which benefits from a EUR 307.6m grant provided by the EU under the "Connecting Europe Facility", is included in the list of Projects of Common Interest (PCI) by the European Commission due to its strategic importance for the security and energy sustainability of Tunisia and Italy. The project is fully aligned with the NDICI Mandate and the EU New Agenda for the Mediterranean, especially the "Green transition: climate change resilience, energy and environment" Policy Area, as well as the EU flagships, notably flagship 5 "Connected economies". The Project is also aligned with the Team Europe Initiative (TEI) Tunisia-Investment as it would further integrate Tunisia to the global economy, while improving economic infrastructure for a resilient and carbon-neutral economy.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
13 Dezember 2023
30 Dezember 2023
Link zum projekt

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Umwelt- und Sozialverträglichkeitsprüfung - STEG - TUNISIA ITALY POWER INTERCONNECTION
Datum der Veröffentlichung
15 Nov 2023
Sprache
Bereich
Finanzierung
Nummer des Dokuments
181669076
Thema
Umweltinformationen
Projektnummer
20170028
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen
Umwelt- und Sozialverträglichkeitsprüfung - STEG - TUNISIA ITALY POWER INTERCONNECTION - Resettlement Framework
Datum der Veröffentlichung
15 Nov 2023
Sprache
Bereich
Finanzierung
Nummer des Dokuments
181682889
Thema
Umweltinformationen
Projektnummer
20170028
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen
Formblatt ökologische und soziale Aspekte - STEG - TUNISIA ITALY POWER INTERCONNECTION
Datum der Veröffentlichung
19 Dec 2023
Sprache
Bereich
Finanzierung
Nummer des Dokuments
180306654
Thema
Umweltinformationen
Projektnummer
20170028
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdemechanismus

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

Weitere Veröffentlichungen