Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    300.000.000 €
    Länder
    Sektor(en)
    Italien : 300.000.000 €
    Wasser, Abwasser : 15.240.150 €
    Industrie : 29.703.618 €
    Dienstleistungen : 34.860.000 €
    Stadtentwicklung : 45.476.382 €
    Müllbeseitigung : 56.309.850 €
    Gesundheit : 118.410.000 €
    Unterzeichnungsdatum
    25/06/2021 : 7.620.075 €
    24/07/2020 : 7.620.075 €
    25/06/2021 : 14.851.809 €
    24/07/2020 : 14.851.809 €
    25/06/2021 : 17.430.000 €
    24/07/2020 : 17.430.000 €
    25/06/2021 : 22.738.191 €
    24/07/2020 : 22.738.191 €
    25/06/2021 : 28.154.925 €
    24/07/2020 : 28.154.925 €
    25/06/2021 : 59.205.000 €
    24/07/2020 : 59.205.000 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    5 August 2020
    Projektstatus
    Referenz
    Unterzeichnet | 24/07/2020
    20200096
    Projekttitel
    Projektträger – Finanzintermediär
    SVILUPPO SOSTENIBILE REGIONE LAZIO COVID-19 FL
    REGIONE LAZIO
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 300 million
    EUR 392 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The operation will support a multi-sector investment programme of the Lazio Region. The investment programme is plan-led and well embedded in the context of the Documento Strategico di Programmazione 2018-2023 for the XI Legislature (Programming Strategic Document for 2018-2023-DSP), addressing a balanced territorial development. The schemes selected focus on climate resilience, taking into account mitigation and adaptation, as well as on the improvement of public services provision by means of public infrastructure enhancement. This operation can also finance emergency measures to fight against the COVID-19 pandemic.

    The Project is expected to have a number of significant positive externalities and spillover effects resulting from the implementation of the investment priorities supported by the operation, which are well integrated into the planning process and the socioeconomic objectives of the regional strategies and plans. Some of these externalities are: - Reduction of CO2 emissions due to energy efficiency in buildings - Decrease in the operational costs of public buildings because of energy savings - Reduction of air pollution - Improvement of the preparedness of the health and social provision systems - Reduction of flood risks - Preservation of natural and cultural heritage - Improvement of waste management and recycling - Upgrading of water infrastructure - Improvement of the quality of life and productivity derived from a better use of public funds

    Umweltaspekte
    Auftragsvergabe

    The schemes financed are small and, basically, located in consolidated urban areas or they involve the upgrading of existing infrastructure. However, during appraisal and at the allocation phase, the EIB will check that the Promoter complies with Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU should any scheme fall in Annex II of the above-mentioned Directive and that plans and programmes comply with to SEA Directive 2001/42/EC when relevant. In addition, the Promoter will have to comply with the relevant Habitats and Birds Directives (92/43/EEC and 2009/75/EU). The new and refurbished buildings are subject to the Energy Performance of Buildings Directive (2010/31/EU) and its amendments included in Directive 2018/844/EU, when relevant.

    The Promoter has to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/23/EU or 2014/24/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - SVILUPPO SOSTENIBILE REGIONE LAZIO COVID-19 FL
    Datum der Veröffentlichung
    15 Aug 2020
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    127041928
    Thema
    Umweltinformationen
    Projektnummer
    20200096
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen