Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    30.000.000 €
    Länder
    Sektor(en)
    Frankreich : 30.000.000 €
    Verkehr : 30.000.000 €
    Unterzeichnungsdatum
    21/07/2022 : 30.000.000 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    13 Mai 2022
    Projektstatus
    Referenz
    Unterzeichnet | 21/07/2022
    20210785
    Projekttitel
    Projektträger – Finanzintermediär
    PONT ET BARREAU DE CAMELAT
    AGGLOMERATION D'AGEN
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 30 million
    EUR 70 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project consists of the construction of a new 3 km road section between the N21 (on the right bank of the Garonne River) and the D119, directly connected to the new motorway interchange on the A62 (Agen Ouest), which is part of the Atlantic Core Network Corridor. The road is a single carriageway (1+1 lanes) with a separated bi-directional path for cyclists and pedestrians. It includes a bridge over the Garonne River, and a viaduct crossing the side channel to the Garonne River. The project also includes the re-meandering and revegetation of existing artificial ditches within the road corridor.

    The project aims at completing the Agen western bypass, by connecting the N21 to A62 Trans-European Transport Network (TEN-T) motorway. This will notably allow to open up the south-east part of the Département du Lot-et-Garonne. The road will form an essential link for the "Agen Rive Gauche" economic zone and forms an integral part of the Sustainable Urban Mobility Plan (SUMP) of the agglomeration.

    Additionality and Impact

    Le projet améliore la connectivité tant urbaine que régionale et contribue à la cohésion sociale et économique de l'Aquitaine, une région en transition. Il remédie à la faible accessibilité du réseau central RTE-T. Le projet améliorera la cohésion territoriale et la connectivité intermodale (gare TGV prévue, réseau de transport urbain), contribuant ainsi au rééquilibrage modal et à la réduction des embouteillages dans l'agglomération d'Agen. Grâce à la réduction de la distance parcourue sur le corridor nord-sud et au détournement du trafic hors du centre-ville, les effets induits des transports seront réduits. L'intégration d'infrastructures sûres pour les cyclistes et les piétons dès le stade de la conception est susceptible d'encourager le transfert modal dans la zone concernée et de contribuer à l'atténuation des changements climatiques. Le Coût d'Investissement du Projet peut relever à plus de 15 % de l'action pour le climat.

    Le prêt de la BEI complétera la subvention accordée par l'État dans le cadre du Plan de relance ainsi que la subvention consentie par le département du Lot-et-Garonne. Il permet en effet à l'Agglomération d'étaler son effort de financement tout en payant, dans des délais normaux, chacune des entreprises intervenant sur ce chantier.

     

    Le financement à long terme accordé par la BEI contribuera à rendre l'investissement plus rentable pour l'emprunteur (étant donné que cette contrepartie n'a pas facilement accès à une telle association de durée, délai de grâce, flexibilité en matière de tirage et tarification) et il contribuera à diversifier ses sources de financement.


    Umweltaspekte
    Auftragsvergabe

    The project falls under Annex II of the Directive 2011/92/EU as amended by Directive 2014/52/EU and subject to environmental impact assessment (EIA) as decided by the competent authority. The project has received the public-interest utility declaration (DUP) and environmental authorisation from the prefecture of Lot-et-Garonne on February 11, 2022. The project intersects the "Garonne in New Aquitaine" Natura 2000 site under the amended Habitats Directive (92/43/EC). Appropriate avoidance, mitigation and compensation measures were determined, including fauna/flora protection, noise reduction measures, landscaping and reforestation as well as water protection measures. The project is considered to be aligned with the low carbon goal as it consists of large new road capacity infrastructure construction meeting the EIB eligibility criteria for Transport. No residual environmental impact is expected if all the identified avoidance, reduction and compensation measures are properly implemented.

    The Promoter is a public contracting authority subject to the relevant EU directives. The procurement procedures for all major works contracts were launched between the fourth quarter of 2021 and the first quarter of 2022 through an open tender after international publications in the Official Journal of the EU (OJ ref. 567502-2021 amended by 636930-2021 and 572942-2021 amended by 643287-2021). Their award is expected in April 2022. There has been no claim or complaint from tenderers or other contractors, and there are no legal processes pending.

    Link zum projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Umwelt- und Sozialverträglichkeitsprüfung - PONT ET BARREAU DE CAMELAT - Link to EIA report
    Datum der Veröffentlichung
    27 Jun 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    158350076
    Thema
    Umweltinformationen
    Projektnummer
    20210785
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Umwelt- und Sozialverträglichkeitsprüfung - PONT ET BARREAU DE CAMELAT - Résumé Non Technique
    Datum der Veröffentlichung
    20 Jul 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    156038993
    Thema
    Umweltinformationen
    Projektnummer
    20210785
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Formblatt ökologische und soziale Aspekte - PONT ET BARREAU DE CAMELAT
    Datum der Veröffentlichung
    21 Jul 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    153196829
    Thema
    Umweltinformationen
    Projektnummer
    20210785
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen