Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
1.900.000.000 €
Länder
Sektor(en)
Italien : 1.900.000.000 €
Energie : 1.900.000.000 €
Unterzeichnungsdatum
30/03/2023 : 450.000.000 €
30/03/2023 : 450.000.000 €
8/11/2022 : 500.000.000 €
7/02/2024 : 500.000.000 €
Link zum projekt
Datenblätter

Übersicht

Veröffentlichungsdatum
14 November 2022
Projektstatus
Referenz
Unterzeichnet | 08/11/2022
20220162
Projekttitel
Projektträger – Finanzintermediär
TYRRHENIAN LINK
TERNA - RETE ELETTRICA NAZIONALE SPA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 1900 million
EUR 3800 million
Ort
Sektor(en)
Beschreibung
Ziele

The investment consists of an undersea high-voltage direct 950 km long current cable, connecting the Italian peninsula with Sicily (East section) and connecting Sicily with Sardinia (West section). The East section (Campania to Sicily) will have an installed capacity of 1000 MW (500 MWx2) and an approx. length of 480 km. The West section (Sicily to Sardinia) will have a total capacity of 1000 MW (500 MWx2) and an approx. length of 470 km. The investment will include associated works such as terrestrial underground cables and relevant connections.

The Tyrrhenian Link will ensure electricity transmission between Italian mainland and the two islands of Sicily and Sardinia. The result will be an enhanced stability of the electrical system of the two islands and allow a more flexible integration of the renewable energy sources, necessary to fulfil the objective of phasing-out of coal power plants according the targets established by the Integrated National Energy and Climate Plan (INECP). Such plan foresee that, in 2030, renewables will cater for more than half of gross electricity consumption 55.4% with a complete phase-out of coal by 2025 that represent 8 GW of reduced generation capacity, of which 1 GW is located in Sardinia.

Additionality and Impact

The Project contributes to addressing multiple market failures, with significant impacts and net economic benefits for Italy and for the regions concerned, which are "Cohesion Regions".

Thanks to the Project, the Country can progress towards its energy and climate plans faster and achieve a more cost-effective decarbonisation and energy transition. The high quality of the results of the Project is underpinned by significant experience and competence of the Promoter with the development and operation of this type of infrastructure.

The support of the Bank, which is urgent and time-sensitive, contributes to the acceleration of the Project's implementation, by lowering the associated cost of funding and offering a tenor longer than those usually available in the market. The EIB commitment is expected to contribute to crowding-in other financers, as it would send a strong signal about the long-term soundness of the Project and credit worthiness of the Borrower.

The value added provided by the EIB is even more tangible under the current market instability and turmoil generated by the pandemic and the Russia-Ukraine conflict, considering also the magnitude of the Project.

Umweltaspekte
Auftragsvergabe

Given its technical characteristics, the project does not fall under either Annex I or Annex II of the Environmental Impact assessment (EIA) Directive and, according to Italian law, will not be subject to a mandatory EIA. The Tyrrhenian Link will run across coastal and marine areas and an "Appropriate Assessment" on the possible impacts to the marine environment through habitat damage or loss, noise, chemical pollution, heat and electromagnetic field emissions was completed for the East Section and is being carried out for the West Section of the cable. The Environmental and Social due-diligence will focus on the review of the assessments carried out for the project under the current authorization framework, which refers to national and European contest (e.g. Habitats and Water Framework Directives and others), and the associated feedbacks from competent authorities.

The promoter has to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU and with the Italian Public Procurement Act (D.lgs. 50/16).

Link zum projekt
Übersicht

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - TYRRHENIAN LINK
Datum der Veröffentlichung
13 Dec 2022
Sprache
Bereich
Finanzierung
Nummer des Dokuments
155550423
Thema
Umweltinformationen
Projektnummer
20220162
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Aktuelles und Storys

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdemechanismus

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

Weitere Veröffentlichungen