Unterzeichnung(en)

Betrag
33.000.000 €
Länder
Sektor(en)
Kosovo* : 33.000.000 €
Energie : 33.000.000 €
Unterzeichnungsdatum
18/03/2024 : 33.000.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
26 Mai 2023
Projektstatus
Referenz
Unterzeichnet | 18/03/2024
20220274
Projekttitel
Projektträger – Finanzintermediär
KEK SOLAR PV - GLOBAL GATEWAY
KORPORATA ENERGJETIKE E KOSOVES SHA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 33 million
EUR 107 million
Ort
Sektor(en)
Beschreibung
Ziele

The project concerns the development of a 100MW solar photovoltaic (PV) power plant, located between Obilic and Fushe Kosova, in close proximity to Pristina, in Kosovo. The PV plant will produce electricity from low carbon sources, therefore it addresses the market failure of negative environmental externalities, by reducing carbon and air pollution.

The aim is to deploy new renewable energy capacity in Kosovo, crucial for the achievement of the decarbonisation targets for 2026 as set out in the in the National Renewable Energy Action Plan (NREAP). Kosovo depends almost exclusively on two ageing lignite plants for its electricity. The project is in line with the EIB's lending priority objectives of financing Renewable Energy, Climate Action, Environmental Sustainability, as well supporting a Pre-Accession region. It is also aligned with the EU Green Agenda for the Western Balkans.

Additionality and Impact

The project concerns the development of a 100MW solar photovoltaic power plan in close proximity to Pristina. The Bank will support the deployment of new renewable energy capacity in Kosovo, crucial for the achievement of the decarbonisation targets set out in the draft National Energy and Climate Plan. The Bank's financing will also support the EU Green Agenda for the Western Balkans. The project is in line with the Bank's lending priority objectives on Energy (Renewable Energy) as well as the transversal objectives on Climate Action (mitigation), Environmental Sustainability (Pollution Prevention Control), and Social and Economic Cohesion (other regional integration).  In terms of addressing market failures, the solar PV project produces electricity from low carbon sources and thereby addresses the market failure of negative environmental externalities, through the reduction of carbon and air pollution compared with coal generation. The majority of the generation will be dedicated to KEK's universal service obligation, with a regulated tariff. The remainder is expected to be sold on the new ALPEX electricity exchange. Thus the project will support market integration. The project is expected to generate a broader social benefit by generating electricity below the cost of coal based alternatives in Kosovo. Moreover, the project is expected to be supported by adequate governance and capabilities of the promoter, considering the technical assistance given through a specific grant from the Western Balkans Investment Framework (WBIF). 


The project contributes mainly to SDG 7 (access to affordable, reliable, sustainable and modern energy), in particular sub goal 7.2 (increase the share of renewable energy in the global energy mix), and SDG 13 (combat climate change).


The Bank's financial contribution to the project is relevant, as the Borrower is unable to raise funds at similar maturities. Moreover, the EIB loan offers customised terms, such as flexibility of drawdowns, longer availability and grace periods, possibility for interest rate conversion and possibility to select fixed or floating rates at the time of disbursement. The EIB participation is complementary, blended with financing from other International Financial Institutions and grants from the WBIF.


Umweltaspekte
Auftragsvergabe

Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures applied as necessary.

The EIB will require the Promoter to ensure that any procurement procedures are done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules.

Kommentar(e)

* This designation is without prejudice to positions on status, and it is in line with UNSCR 1244/1999 and ICJ Opinion on the Kosovo declaration of independence.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
13 Dezember 2023
18 März 2024
Link zum projekt

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Umwelt- und Sozialverträglichkeitsprüfung - KEK SOLAR PV - GLOBAL GATEWAY - VLERËSIMI I NDIKIMIT MJEDISOR (VNM) PËR CENTRALIN DIELLOR PV “KOSOVA-A
Datum der Veröffentlichung
7 Nov 2023
Sprache
Bereich
Finanzierung
Nummer des Dokuments
182239686
Thema
Umweltinformationen
Projektnummer
20220274
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen
Formblatt ökologische und soziale Aspekte - KEK SOLAR PV - GLOBAL GATEWAY
Datum der Veröffentlichung
16 Dec 2023
Sprache
Bereich
Finanzierung
Nummer des Dokuments
161175041
Thema
Umweltinformationen
Projektnummer
20220274
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Aktuelles und Storys

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdemechanismus

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

Weitere Veröffentlichungen