Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    120.000.000 €
    Länder
    Sektor(en)
    Spanien : 120.000.000 €
    Gesundheit : 120.000.000 €
    Unterzeichnungsdatum
    24/05/2024 : 120.000.000 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    25 September 2023
    Projektstatus
    Referenz
    Signed | 24/05/2024
    20220360
    Projekttitel
    Projektträger – Finanzintermediär
    CASTILLA Y LEON HEALTH INFRASTRUCTURE II
    COMUNIDAD AUTONOMA DE CASTILLA Y LEON
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 175 million
    EUR 356 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project concerns the modernisation of the public health service infrastructure of the Autonomous Community of Castilla y León (Spain). More specifically, it will finance the construction, renovation and or extension of several hospitals and outpatient centres, as well as the acquisition of related medical equipment.

    The aim is to modernise the health estate and upgrade service delivery, in line with the EIB's primary objective of "Innovation, digital and human capital" (Health). The project will bring wider benefits to the community as healthcare is an element of social cohesion and economic development.

    Additionality and Impact

    The European Investment Bank (EIB), in partnership with Comunidad Autónoma de Castilla y León (CACL), will support CACL's efforts to improve the level of service in the regional public health system. To this end, the EIB will finance the construction of a new hospital, coupled with renovation and modernization works in existing hospitals, and the acquisition of medical equipment (the Project).

     

    The Project is aligned with EIB's Health Policy objectives and with the Urban Agenda for the European Union. Moreover, it aims to contribute to the priority objective of the European Commission to "make public health systems more cost-effective, equitable and sustainable."

     

    This Project will contribute directly to promote progress towards multiple Sustainable Development Goals, comprising good health and well-being; decent work and economic growth; industry, innovation and infrastructure; and sustainable cities and communities.

     

    This Project will generate positive externalities and economic benefits through the provision of improved healthcare services including enhanced preparedness to respond to increasing demand for care by an ageing population, potential future health emergencies, and the reduction of energy consumption that benefits the society and the broader economy.

     

    The availability of long-term finance for health infrastructure at affordable interest rates is a key contribution of the EIB, considering the very long-term nature of the investment and its positive impact on overall project cost.

     

    The EIB loan will include flexible drawdown terms and conditions adjusted to the investment horizon of the projects. 


    Umweltaspekte
    Auftragsvergabe

    Hospitals are not specifically mentioned in the Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by the Directive 2014/52/EU, though the project might be covered by Annex II of the Directive in relation to urban development. The compliance with the requirements of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC as well as the requirements of social standards will be verified during appraisal. In line with Directive 2010/31/EU, the new and rehabilitated buildings will have to meet at least the relevant national targets on energy efficiency. The design energy performance of the hospitals and any specific related targets to be met will be verified during appraisal. The EIB will encourage the promoter to take into account the circular economy principles during the project development and future operation.

    The promoter has to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/24/EU, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    24 November 2023
    24 Mai 2024
    Projekte zum thema
    Link zum projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - CASTILLA Y LEON HEALTH INFRASTRUCTURE II
    Datum der Veröffentlichung
    28 Nov 2023
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    169774125
    Thema
    Umweltinformationen
    Projektnummer
    20220360
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen