Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    290.000.000 €
    Länder
    Sektor(en)
    Spanien : 290.000.000 €
    Gesundheit : 290.000.000 €
    Unterzeichnungsdatum
    1/12/2023 : 290.000.000 €

    Übersicht

    Veröffentlichungsdatum
    29 Februar 2024
    Projektstatus
    Referenz
    Signed | 01/12/2023
    20220436
    Projekttitel
    Projektträger – Finanzintermediär
    A CORUNA PUBLIC UNIVERSITY HOSPITAL COMPLEX PSLF
    COMUNIDAD AUTONOMA DE GALICIA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 450 million
    EUR 600 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project supports investments related to the construction and equipment of the new public university hospital complex (Complejo Hospitalario Universitario A Coruña - CHUAC) in the Autonomous Community of Galicia. The existing facilities have been kept up and running due to regular maintenance investments, partial extensions and refurbishment works, but the current infrastructure has become overly obsolete and insufficient to adapt to the changing needs of the ageing population of Galicia. The urban accessibility is also inadequate and does not correspond to the standards of the 21st century.

    The aim is to replace the existing A Coruña University Hospital, the Teresa Herrera Hospital (maternity and pediatric hospital) and the El Ventorrillo outpatient center. The project involves an almost complete replacement of the current infrastructure with a top of the art facility corresponding to the requirements of the 21st century regarding safety, quality, flexibility, energy efficiency and comfort. A large wide green space will be created both around the access to the hospital and throughout the main axis of the hospital. The new CHUAC and the new parking facility will have circa 140,000m2 and 30,000m2 of gross floor area respectively. Additionally, the promoter envisages to refurbish part of the existing A Coruña University Hospital. Once fully implemented, the new hospital is expected to reach a total of approximately 255,000m2 of gross floor area, giving space to 1,500 hospital beds, 40 operating rooms, 60 diagnostic imaging cabinets, 500 external consultations cabinets, 230 day hospital posts and 45 dialysis stations.

    Additionality and Impact

    The Project supports the Health policy objective. Health externalities include, but are not limited to, containment of communicable and non-communicable diseases and their negative effect on individuals as well as the indirect impact on economic productivity from a healthier workforce and population. Public health care services provision and financing ensure that the quantity and quality of investments in the sector are in line with what is socially optimal. The Project aims to provide higher quality and more accessible healthcare services, responding to the demographic trends and requirements of the region.

    The Bank's participation secures the access to long-term finance at affordable interest rates. This is a key contribution considering the very long-term nature of the financed assets and its positive impact on the total project cost. In addition, the loan will include flexible drawdown terms and conditions adjusted to the investment horizon of the project, a key differentiating feature of EIB financing highly valued by the borrower.

    Umweltaspekte
    Auftragsvergabe

    The project comprises the construction and equipping of medical facilities. Hospitals are not specifically mentioned in the Environmental Impact Assessment (EIA) Directive 2011/92/EU (amended by the Directive 2014/52/EU) though the project is covered by Annex II of the Directive in relation to urban development. The EIB will verify during appraisal the screening decision of the competent authority. In line with Directive 2010/31/EU, the new and rehabilitated buildings will have to meet at least the relevant national targets on energy efficiency. The design energy performance of the hospital and any specific related targets to be met will be verified during appraisal. It is expected that the project will bring wider benefits to the community as healthcare is an element of social cohesion and economic development. The EIB will encourage the promoter to consider the circular economy principles during the development and future operation of the project. Compliance with Environmental and Social standards will be fully verified during appraisal.

    The promoter has to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/24/EU, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Kommentar(e)

    Financing proposed by the EIB: EUR 450 million, of which EUR 160 million is conditional on obtaining a grant from the European Commission under Pillar 3 of the Just Transition Mechanism ("Public Sector Loan Facility "PSLF).

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    24 November 2023
    1 Dezember 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - A CORUNA PUBLIC UNIVERSITY HOSPITAL COMPLEX PSLF
    Datum der Veröffentlichung
    14 Mär 2024
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    192020306
    Thema
    Umweltinformationen
    Projektnummer
    20220436
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen