    105.000.000 €
    Länder
    Sektor(en)
    Litauen : 105.000.000 €
    Energie : 105.000.000 €
    Unterzeichnungsdatum
    12/03/2024 : 105.000.000 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    4 Oktober 2024
    Projektstatus
    Referenz
    Unterzeichnet | 12/03/2024
    20230271
    Projekttitel
    Projektträger – Finanzintermediär
    LITHUANIAN PUMPED HYDRO STORAGE
    AB IGNITIS GAMYBA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 105 million
    EUR 150 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project concerns the extension of Kruonis pumped hydro storage power plant by installing an additional pump-turbine unit in the existing powerhouse.

    The development of hydropower pumped storage hydropower supports national and European targets related to renewable energy production and thus contributes to climate change and security of energy supply objectives of the EU. The project is therefore eligible under Article 309 (c) common interest in energy (renewable energy) and also contributes to the environmental protection (tackling climate change). Additionally, it is also in line with the EIB's priority objectives for energy sector lending in the EU related to renewable energy sources and climate action.

    Additionality and Impact

    Investment in the project will finance the deployment of additional pumped storage capacity in Lithuania, supporting the country's goal of meeting 100% of electricity demand from renewable energy sources (RES) by 2030. The steep increase in intermittent RES, mainly wind energy and photovoltaic (PV), requires a strong increase of flexibility in the grid, including storage capacity and frequency and voltage control, which can be provided by pumped storage hydropower plants.


    Storage technologies act as enabling infrastructure in the energy transition and contribute towards increasing security of fuel supply by reducing dependency on energy imports and ensuring price stability. Security of supply can be considered as a public good, which is not always effectively reflected in market prices.


    The financing of this project is in line with the Bank's energy lending policy by supporting the energy transformation as enabling infrastructure (networks, storage) for the integration of renewable energy sources. Thereby also transversal objectives on Climate Action (mitigation) are met by the project.


    By enabling the increased deployment of intermittent RES the project also addresses negative climate and environmental externalities, a market failure, through the reduction of carbon and air pollution, compared to generation and provision of grid system services based on fossil fuels.


    In terms of project results, the projects are expected to have a positive economic return, considering the economic value of the electricity generated. Therefore, the project is expected to generate a broader positive social benefit by generating clean and renewable power at a cost (LCOE) reasonably below the cost alternatives in Lithuania.


    The project is supported by adequate governance and capabilities of the promoter.


    The long tenor of the EIB loan is in line with the economic life of the underlying assets. The funding of similar maturities is not available on the Lithuanian market. Customised terms such as flexible drawdown are of value to the Promoter because of the multiannual Project's implementation period. Moreover, the EIB involvement should have a crowding-in effect.


    Umweltaspekte
    Auftragsvergabe

    The projects may include components that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) as amended by Directive 2014/52/EU, thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for environmental and biodiversity impact and appropriate assessments. Lithuania's Environmental Protection Agency (the Competent Authority) approved the project on 2.6.2022 with the comment that no Environmental Impact Assessment is required. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives.

    The EIB will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation Directive 2014/25/EU, with publication of tender notices in the EU Official Journal, as and where required

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    11 März 2024
    12 März 2024
    Link zum projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - LITHUANIAN PUMPED HYDRO STORAGE
    Datum der Veröffentlichung
    8 Oct 2024
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    182030224
    Thema
    Umweltinformationen
    Projektnummer
    20230271
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Link zum projekt

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen