Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
435.000.000 €
Länder
Sektor(en)
Finnland : 435.000.000 €
Industrie : 435.000.000 €
Unterzeichnungsdatum
11/07/2024 : 435.000.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
22 Juli 2024
Projektstatus
Referenz
Unterzeichnet | 11/07/2024
20230834
Projekttitel
Projektträger – Finanzintermediär
STORA ENSO - RENEWABLE PACKAGING CONVERSION
STORA ENSO OYJ
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 435 million
EUR 1095 million
Ort
Sektor(en)
  • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren
Beschreibung
Ziele

The project will finance investments to convert an idle paper machine from coated fine-paper to consumer board products to improve circularity and support plastic substitution. Additionally, this will support the promoter's growth strategy in renewable packaging by providing new volume for growing packaging segments. The investment is fully aligned with the promoter's sustainability commitments and its strategic shift towards sustainable and renewable packaging solutions. This is the second phase of a large mill conversion into renewable packaging production, which will also significantly improve the carbon footprint of the company.

The modernisation of the mill will reduce its environmental footprint by installing highly efficient process technology in line with Best Available Techniques (BAT). It will support circularity by further enhancing the recycling performance of the Packaging Materials division's product portfolio. The site's total scope 1 and 2 greenhouse gas emissions will remain at a low level (as they were already reduced by 80% during the first conversion in 2021).

Additionality and Impact

The project reduces negative process externalities in producing renewable packaging solutions that require high hygiene standards and, therefore, substitute for plastics in packaging. The project addresses suboptimal investment situations by strengthening supply for, and competitiveness of sustainable, recyclable and renewable packaging applications against traditional mainstream plastics packaging generating negative environmental and carbon externalities. Thereby, the project contributes to the EU Green Deal and is aligned with the Bank's climate action and environmental sustainability objectives, the EU Bioeconomy strategy, EU Packaging and Packaging Waste directive as well as the EU Circular Economy Action Plan.


The proposed loan will diversify Stora Enso's financing sources and extend the debt maturity profile, which will improve the overall financing position of the company. The EIB loan's long tenor is highly valuable to the company in financing assets with long economic lifetimes. The EIB loan supporting renewable packaging investments will also complement Stora Enso's other green and sustainable finance instruments.


Umweltaspekte
Auftragsvergabe

The project is aligned with the EU Green Deal, the EU Bioeconomy and Plastics strategies, and the EU Circular Economy Action Plan. The investment will deliver effective and sustainable solutions for combatting global problems such as plastic waste by substituting fossil-based materials with renewable, recyclable and compostable materials in packaging and consumer goods manufacturing. The project falls under the scope of Annex I of the environmental impact assessment (EIA) Directive 2014/52/EU (amending 2011/92/EU Directive), as well as of the Industrial Emissions Directive (IED) 2010/75/EU. An EIA for the new packing board line is publicly available and an environmental permit change application for the capacity increase is currently underway. A complete assessment of the permitting processes will be done at appraisal.

Although the promoter is a private company not operating in the utilities sector, and is thus not covered by EU directives on procurement, the EIB will require the promoter to ensure that any procurement procedures are done in accordance with the relevant applicable EU procurement rules.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
20 Juni 2024
11 Juli 2024

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Aktuelles und Storys

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdemechanismus

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

Weitere Veröffentlichungen