Veröffentlichungsdatum: 11 April 2005
Projektträger – zwischengeschaltetes Finanzinstitut
A consortium to be selected through a public international tender process.Ort
Beschreibung
Design, construction/widening maintenance and operation, under a long-term concession, of a 25km real toll motorway, of which 4 km are already built, as well as, for a period of 5 years, operation and maintenance of 64km of roads.
Ziele
Through improving road standards and increasing road capacity in the greater Lisbon area, the project will improve flows of passenger and freight traffic. Immediate benefits will be reductions in travel time and in vehicle operating costs, as well as improvements on traffic safety.
Kommentar(e)
Road transport.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to 50% of total project cost.
Gesamtkosten (voraussichtlicher Betrag)
Indicatively estimated in the range of EUR 200 million to EUR 250million.
Umweltaspekte
Compliance with EU environmental directives and national laws shall be ensured.
Auftragsvergabe
The project has been advertised in the Official Journal of the EU in accordance with EU Directive 93/37/EEC.
Projektstatus
Unterzeichnet - 10/01/2007
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).