Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20010354
    Veröffentlichungsdatum: 30 März 2005

    Projektträger – zwischengeschaltetes Finanzinstitut

    Municipality of Bucharest.

    Ort

    Beschreibung

    The project concerns the treatment of Bucharest wastewaters currently discharged untreated into downstream Dambovita River, causing tremendous pollution to the Danube and Black Sea basin. The wastewater treatment plant will have an average treatment capacity of 18m3/sec, a pollution load of 2.4m population equivalent, and will be one of the largest in Europe.

    Ziele

    The project will accelerate Romania’s compliance with EU environmental standards, significantly improve the environmental situation in and downstream Bucharest towards the Danube basin, reduce public health risks by reducing pollution, and support management of natural resources. The project will assist in developing institutional capacity in the environmental services sector. The Bank loan will complement grant money from the European Commission (ISPA Programme).

    Kommentar(e)

    Environment – water and wastewater treatment.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 80.10m.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 266.48m.

    Umweltaspekte

    The project falls under Annex I of the EIA Directive 97/11/EC amending 85/337/EEC. A comprehensive Environmental Impact Assessment and procedures including public consultation have been done and are being reviewed by the Bank and the European Commission as part of the appraisal process.

    Auftragsvergabe

    Tendering procedures will follow the principles of the respective EU procurement directives, including, where required, publication in the EU Official Journal. Works, supplies and services will be tendered jointly with the European Commission, and the Bank will align with EU procurement regulations. Tender evaluation procedures will be closely monitored by the Commission’s Delegation in Bucharest.

    Projektstatus

    Unterzeichnet - 29/05/2006

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Rumänien Wasser, Abwasser