Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20010734
Veröffentlichungsdatum: 6 Juni 2002

Projektträger – zwischengeschaltetes Finanzinstitut

Transco plc
130 Jermyn Street
London SW1Y 4UR
UK
Contact Point: Malcolm Cooper

Ort

Beschreibung

The project intends to expand the gas transmission and distribution networks in the UK to meet future demand as well as to improve the operational safety of gas transmission systems and reduce gas losses. The proposed loan finances part of a capital expenditure programme, which has recently been agreed with the industry regulator. Investments will include the accelerated mainsreplacement programme requested by the Health and Safety Executive.

Ziele

The project is aimed at aiding the promoter to meet peak capacity requirements for the transmission and distribution of natural gas and to fulfill legal and regulatory requirements regarding safety and the environment. In particular, the project is designed to result in improved safety and reliability of the supply network, to cater for demand growth, and reduce greenhouse gas emissions and technical losses.

Kommentar(e)

Oil and gas

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

GBP 200 million (EUR 326 mio)

Gesamtkosten (voraussichtlicher Betrag)

Estimated to be about GBP 1,500 mio for the period 2002-04.

Umweltaspekte

The schemes included in the project fall under Annex II of Directive 97/11/EC. The promoter has confirmed that Environmental Impact Assessment (EIA) procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate.

Auftragsvergabe

The programme falls under the Procurement Directive 93/38/EC and its amendment 98/4/EC. The promoter has confirmed to fully comply with its requirements. Advertising and notices are regularly placed in the Official Journal where appropriate. Companies are pre-qualified and contracts are usually awarded using restricted and negotiated procedures.

Projektstatus

Unterzeichnet - 31/05/2002

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Energie