Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20040676
Veröffentlichungsdatum: 7 März 2005

Projektträger – zwischengeschaltetes Finanzinstitut

Senate Properties
Lintulahdenkatu 5A
PL 237
FI-00531 HELSINKI

Ort

Beschreibung

The project comprises the planning and construction of new buildings, and the rehabilitation, extension, and equipping of existing facilities for higher education and research establishments throughout Finland; a total of 133 individual schemes are included in the project.

Ziele

Its purpose is to improve higher education and research infrastructure facilities in order to meet the requirements of Finnish higher education strategy. It will contribute to rationalizing the geographical supply of educational facilities and ensuring an optimal use of resources. A number of schemes are located in Objective 1 or Objective 2 areas as defined under the Structural Funds; project implementation should have wide economic and social effects on assisted areas through the upgrading of higher education facilities, which in turn should create positive spill-over effects into industry.

Kommentar(e)

Human capital (education); i2i (education and training).

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 120 million.

Gesamtkosten (voraussichtlicher Betrag)

Approximately EUR 547 million.

Umweltaspekte

Educational activities are not specifically mentioned in Council Directive 97/11/EEC on Environmental Impact Assessment (EIA); however they may fall within the scope of Annex II of the Directive as Urban Development projects. This project concerns the renovation of existing buildings and the construction of new buildings located on sites dedicated to academic use and already developed. An EIA is not required under Finnish legislation currently in force for this type of scheme. However, the subprojects are subject to town planning rules; in this regard, regulations have been fully respected and all relevant permits have been obtained following completion of the necessary studies (including environmental studies). Furthermore, the Promoter encourages sustainable development by taking lifecycle and environmental matters into account, and its building standards incorporate environmentally-friendly design features, including the application of stringent energy efficiency standards.

Auftragsvergabe

Procurement procedures applied are in compliance with EU Council Directives and national legislation.

Projektstatus

Unterzeichnet - 12/12/2005

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Finnland Bildung