Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20050136
Veröffentlichungsdatum: 21 November 2005

Projektträger – zwischengeschaltetes Finanzinstitut

Acegas-APS Ambiente is a municipal multi-utility commercial company, operating in the greater areas of Trieste and Padua. The company, created through the merger of Acegas (Trieste) and Aps (Padua) in December 2003, operates in the fields of electricity generation and distribution, gas distribution, water and waste management.

Ort

Beschreibung

Investments in the treatment of urban waste, undertaken by the municipal utility in the area of Padua.

Ziele

The project concerns the promoter’s three-year waste management investment program (2005-2007) including the re-profiling and extension of an existing landfill for municipal solid waste (MSW) situated at Ponte San Nicoló and the extension of one of its existing MSW incineration plant by a 3rd unit (nominal unit capacity 90 kt/year) located in Padua.

Kommentar(e)

Energy and environment.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 30 million.

Gesamtkosten (voraussichtlicher Betrag)

EUR 60 million.

Umweltaspekte

The extension of the existing waste incineration plant by a 3rd unit falls according to its technical characteristics under Annex I of the EIA Directive 97/11/EC; however, being an extension of a previously authorized plant it may fall under Annex II, item 13, in which case an EIA may be required subject to a case-by-case decision or defined criteria set by the competent authorities. The landfill and the transfer stations fall according to their technical characteristics under Annex II. The details of the environmental procedures followed including the results of the EIA and public consultation, if applicable and proposed mitigating measures will be reviewed during appraisal. Concerning the “Habitats” Directive 92/43/EEC and the Natura 2000 network, the investment is not expected to have a significant impact on any site of nature conservation.

Auftragsvergabe

OJEU lists two tender notices, linked to the procurement of the 3rd waste incinerator unit (call for bids: 2001/S6-003743; award notice: 2004/S16-012973).

Projektstatus

Unterzeichnet - 15/12/2009

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Müllbeseitigung