Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20050359
Veröffentlichungsdatum: 31 Januar 2007

Projektträger – zwischengeschaltetes Finanzinstitut

The Portuguese state (Ministry of Health).

Ort

Beschreibung

30-year DBFM (design, build, finance, maintain) project finance concession for the construction and operation of a new hospital in the area of Braga.

Ziele

The new hospital will serve the Braga and Viana do Castelo areas of the Northern Region of Portugal, with a local catchment population of around 300 000 and a reference catchment population of up to 1 million in some specialities. It will replace the existing São Marcos Hospital, which consists of a number of buildings in the centre of Braga, as well as a psychiatric department located some 3km away.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to 50% of the project cost.

Gesamtkosten (voraussichtlicher Betrag)

To be evaluated.

Umweltaspekte

Compliance with EU environmental directives and national laws will be ensured.

Auftragsvergabe

The project has been advertised in the Official Journal of the EU in September 2004 in accordance with relevant EU procurement legislation (Directive 93/38/EEC).

Projektstatus

Unterzeichnet - 3/06/2009

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Portugal Gesundheit