Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20060238
Veröffentlichungsdatum: 24 November 2006

Projektträger – zwischengeschaltetes Finanzinstitut

Antalya Buyuksehir Belediyesi - Antalya Greater Municipality.

Ort

Beschreibung

The project consists of the construction of an 11 km double-track tramway system with 16 stations including a depot, maintenance shops and yards. The project is designed to satisfy passenger demands estimated by the Transportation Master Plan for the year 2020, which is estimated to be up to 14,200 passengers/hour/direction.

Ziele

Transport throughout the municipality of Antalya is currently road-based, comprising public buses, minibuses, taxis and private cars. By developing a rail-based system, the municipality aims to improve the quality and enhance the attractiveness of its public transport services. The main economic benefits of the project are expected to be lower levels of road accidents, travel-time savings, reduction in fuel consumption and vehicle usage costs, and reduction in pollution.

Kommentar(e)

Urban Transport.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 60 million.

Gesamtkosten (voraussichtlicher Betrag)

EUR 122 million.

Umweltaspekte

The Bank’s Environmental Statement 2004 states that “The EIB ensures that all projects it finances […] comply with the EU’s Directive on Environmental Assessment.” Within the EU, the project would be considered to fall within the scope of Annex II of Directive 85/337/EEC (as amended) and it would therefore be for the competent authority to decide whether an EIA was required. During the appraisal, the Bank will therefore investigate the screening process applied to this project and, if an EIA is required, will ensure that environmental studies and public consultation for the project comply with EU Directives.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement.

Projektstatus

Unterzeichnet - 18/07/2007

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Türkei Verkehr