Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20080170
Veröffentlichungsdatum: 29 August 2008

Projektträger – zwischengeschaltetes Finanzinstitut

Romania

Ort

Beschreibung

The project aims at co-financing eligible projects for EU grant assistance under the structural and cohesion funds during the programming period 2007-2013 within 3 sector operational programmes as well as potential projects in the identified sectors under the NSRF/National Development Plan which do not benefit from grant support during the present programming period.

Ziele

The facility would contribute to the development and implementation of key infrastructure projects in line with the EU programming period 2007-2013 as well as to enhance the speedier absorption of EU grants by offering the possibility of availability of funds at an early stage of project implementation.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 1000 million.

Gesamtkosten (voraussichtlicher Betrag)

EUR 12 billion.

Umweltaspekte

The project, being a multi-sector multi-scheme operation classified as Framework Loan/Structural Programme Loan, will have a number of effects on the environment, including reduction of pollution, reduced use of energy, increase of safety, improved water and wastewater services. The Bank will require from the promoter to act according to the provisions of the relevant EU directives, including SEA, EIA, Habitats, Birds Directives, as transposed in the national law.

Auftragsvergabe

The promoter as a public administration entity is required to follow the EU public procurement rules (2004/18/EC) including publication of contract notices in the EU Official Journal as implemented by national law.

Projektstatus

Unterzeichnet - 24/11/2008

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Rumänien Kombinierte Infrastrukturvorhaben Verkehr Wasser, Abwasser