Veröffentlichungsdatum: 26 August 2008
Projektträger – zwischengeschaltetes Finanzinstitut
Bizkaiko Garraio Partzuergoa Consorcio de Transportes de VizcayaOrt
Beschreibung
The project comprises the extension of the existing metro system of Bilbao. The extension 1 from Portugalete to Kabiezes (Line 2) is 3.8 km long and it includes 3 new stations (Penota, Santurtzi, Kabiezes).
Ziele
A Y-shaped metro network, formed with two lines, of 31 km and 20 km respectively with a common section of 10 km traversing Bilbao and its surroundings, would constitute the first phase of a larger metro network. The present project consists of the completion of the first phase of the metro network.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 210 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 420 million.
Umweltaspekte
The project falls under Annex II of Directive 85/337/CEE (as amended) under which the national authorities decide, on a case-by-case basis, whether or not a full EIA is needed. Accordingly, EIAs have been carried out for sections Santurtzi-Kabiezes and Ariz-Basauri and will be further analysed during appraisal.
Auftragsvergabe
The awarding authorities are public entities and follow national and EU procurement procedures (Directive 2004/17/CE), including publication of notices in the OJEC.
Projektstatus
Unterzeichnet - 27/04/2009
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).