Veröffentlichungsdatum: 12 September 2012
Projektträger – zwischengeschaltetes Finanzinstitut
ATTIKO METRO S.A.Ort
Beschreibung
Construction of extension of the Thessaloniki metro system, including the upgrading of existing fleet, signalling and control systems, parking facilities.
Ziele
The project runs through areas designated as Convergence Regions and is therefore eligible for Bank financing under Article 309, point (a) projects for developing less developed regions - “regional development” and (c) common interest - “enhancing urban environment – sustainable urban transport”, of the EC Treaty.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 400 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 820 million
Umweltaspekte
Metro Projects fall under Directive 2011/92/EU and therefore competent authorities decide on a case by case analysis if a full EIA has to be carried out or not. In this case, a full EIA has been carried out. During the appraisal it will be examined that all parts of the project comply with EU Directives on the environment, including the EIA Directive 2011/92/EU, the Habitats Directive 92/43/EEC and the Birds Directive 79/409/EEC. The question of the projects falling within a plan or a program requiring a Strategic Environmental Assessment (SEA) in line with EU Directive 2001/42/EC will also be further examined during appraisal.
In general, metro projects are characterised by a positive impact on the environment thanks to the ability of metro’s to attract car drivers into the public transport system and because underground infrastructure removes surface traffic from densely built-up urban area.
Auftragsvergabe
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EEC/ or 2004/17/EEC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.
Projektstatus
Unterzeichnet - 18/09/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).