Veröffentlichungsdatum: 13 April 2010
Projektträger – zwischengeschaltetes Finanzinstitut
Lahti Energia
Ort
Beschreibung
The project consists of two new circulating fluidised bed (CFB) gasifiers, fuel handling and storage, product gas cooling and cleaning systems, boiler, flue gas cleaning and steam turbine power plant, capable of producing 50 MW electricity and 90 MW of heat.
Ziele
The new plant will produce electricity and heat, and will partly replace an existing coal-fired combined heat and power (CHP) plant.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 75 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 160 million.
Umweltaspekte
The project falls under Annex 1 of the EIA directive, and accordingly a full EIA is required. Use of waste fuel brings the main environmental benefits of the project. The project will reduce the amount of waste that is landfilled and it will provide a waste recovery route instead of existing disposal route.
Auftragsvergabe
The promoter is a public sector controlled entity and thereby required to follow Utilities Directive 2004/17/EC in the procurement. Electricity generation and sales activities in Finland have been exempt from this directive by the decision 2006/422/EC.
Projektstatus
Unterzeichnet - 3/09/2010