Veröffentlichungsdatum: 1 März 2011
Projektträger – zwischengeschaltetes Finanzinstitut
City of Helsinki / Helsinki City Transport
Ort
Beschreibung
The project consists of Helsinki City Transport’s (HKL) investments for the period 2010-2015, including the automation of the signalling system of the metro, acquisition of metro rolling stock and low floor tram cars, renewal of the metro rolling stock depot and the implementation of the Jokeri 2 bus line.
Ziele
The project aims to enhance the public transport system and move towards a more environmentally and financially sustainable transport system in the City of Helsinki. The project will improve the quality of public transport service and will increase the attractiveness of public transport in the urban area.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 250 million
Gesamtkosten (voraussichtlicher Betrag)
Approximately EUR 525 million
Umweltaspekte
Some project components are likely to fall under Annex II of Directive 85/337/EEC (as subsequently amended) and a formal EIA might be required. However, the construction of new rolling stock and metro automation do not fall within the scope of the EU Directive, therefore no EIA is required.
Auftragsvergabe
The Promoter is subject to and follows EU procurement procedures, including publication in the EU Official Journal (in this particular case, Directive 2004/17/CE). All contracts over the relevant EC directive thresholds have been/will be put out to international tendering, with publication of notices in the OJEU.
Projektstatus
Unterzeichnet - 21/10/2011
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).