Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20100303
Veröffentlichungsdatum: 13 September 2012

Projektträger – zwischengeschaltetes Finanzinstitut

MULONGA WATER AND SEWERAGE COMPANY LTD

Ort

Beschreibung

The project consists of investments improving the performance of Mulonga Water and Sewerage Company, one of three Commercial Utilities (CUs) serving the Copperbelt area which borders on the DRC. These investments will also address non-revenue water, increase billing collection rates, and expand networks, especially in poor areas.

Ziele

The purpose of the project is to improve access to water and sanitation, including in peri-urban and low-cost areas, with the aim of contributing to better health conditions as well as positive social and economic development in general.

Kommentar(e)

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 80 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 156 million

Umweltaspekte

An Environmental and Social Impact Assessment (ESIA) according to international best practices has been prepared in order to evaluate the different project options.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Projektstatus

Unterzeichnet - 17/12/2013

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Sambia Wasser, Abwasser