Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20100482
Veröffentlichungsdatum: 28 Dezember 2010

Projektträger – zwischengeschaltetes Finanzinstitut

The project promoter is a renewable energy subsidiary of a large Austrian integrated energy utility group that is controlled by the region of Burgenland.

Ort

Beschreibung

The project consists of the construction and operation of six onshore wind parks located in the Austrian Burgenland region.

Ziele

The development of wind power contributes to EU and national renewable energy objectives, as well as Austrian’s economic development.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 200 million

Gesamtkosten (voraussichtlicher Betrag)

Up to EUR 335 million

Umweltaspekte

All wind farms proposed fall under Annex II of the EIA Directive 85/337/EC. Therefore they can be subject to an EIA on a case by case basis decision or defined criteria set by the competent authority. One wind farm has been screened in during this process, and has undergone an EIA process. The exact EIA status of the remaining schemes will be clarified along with the environmental assessment of all wind farms (including impacts on nature conservation zones and potential cumulative impacts with other wind projects).

Auftragsvergabe

The promoter is a public undertaking but it is not subject to public procurement procedures in the sense of the EU Procurement Directive 2004/17/EC as the Commission has exempted those public contracts from the procurement directive which are awarded to enable to carry out electricity generation in Austria (decision 2008/585EC of 7th July 2008). The Bank will however ensure that procurement procedures applied ensure an appropriate selection of works, goods and services offered at competitive prices.

Projektstatus

Unterzeichnet - 31/10/2011

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Österreich Energie