Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20100705
Veröffentlichungsdatum: 11 Oktober 2011

Projektträger – zwischengeschaltetes Finanzinstitut

Réseau Ferré de France (RFF)

Ort

Beschreibung

Financing of the second phase of the LGV Est railway line, consisting of a 106 km high-speed section between Nancy/Metz and Strasbourg. This line is one of the priority TEN-T (trans-European transport network) operations identified by the European Commission and forms part of the Main Line (Magistrale) for Europe (Paris-Strasbourg-Stuttgart-Vienna-Bratislava artery).

Ziele

The extension of the LGV Est will enhance the attractiveness of the regions and countries concerned and create an enabling environment for development.
The geographical location of the LGV Est Européenne makes it particularly important for improving international services to Germany, Switzerland and Luxembourg as well as interregional services between Ile de France, Lorraine, Alsace and beyond via the LGV Rhin-Rhône and high-speed lines from Paris to the south and the west.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 500 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 2 010 million

Umweltaspekte

The LGV Est Européenne high-speed line is included in the French national master plan for high-speed rail links, which was approved by Decree in 1992. The project falls within the categories listed in Annex I to Directive 97/11/EC and has therefore been subject to an environmental impact assessment (EIA) in accordance with French administrative procedures, which fully incorporate Community legislation. The line's route is close to some sensitive Natura 2000 sites.

Auftragsvergabe

RFF is bound by Community directives on procurement procedures, in particular Directive 2004/17/EC. All works and services contracts above the thresholds laid down will be put out to international tender, with the notices being published in the Official Journal of the European Union (OJ).

Projektstatus

Unterzeichnet - 5/12/2011

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Frankreich Verkehr