Veröffentlichungsdatum: 27 Mai 2013
Projektträger – zwischengeschaltetes Finanzinstitut
HELLENIC GAS TRANSMISSION SYSTEM OPERATOROrt
Beschreibung
Upgrade of a liquefied natural gas (LNG) terminal to increase gas reception, storage and output capacity. The project involves the construction of a third tank, upgrade of the marine facility, the installation of cryogenic equipment and an upgrade of metering.
Ziele
The project aims at debottlenecking storage and handling capacity at the existing LNG terminal.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 80 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 166 million
Umweltaspekte
The project adds installations to an existing LNG terminal on the island of Revithoussa, which is fully dedicated to the terminal’s operation. Given its technical characteristics the project falls under Annex II of the Environmental Impact Assessment (EIA) Directive. The competent authority has obtained an EIA for the construction of the third tank from the Ministry of Environment, Energy and Climate Change (MEECC), and the two other EIAs are being elaborated.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation, with publication of tender notices in the EU Official Journal, as and where appropriate.
Projektstatus
Unterzeichnet - 11/06/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).