Veröffentlichungsdatum: 14 April 2015
Projektträger – zwischengeschaltetes Finanzinstitut
Ministry of Regional Development, Construction, Housing and Municipal Services of UkraineOrt
Beschreibung
Framework loan for the rehabilitation and upgrading of municipal infrastructure in Ukraine
Ziele
The project will extend the life of critical urban infrastructure in the energy, water and sanitation sectors, reducing losses, improving energy efficiency, reducing the intensity of greenhouse gas (GHG) emissions, and contributing to the security of energy and water supply. The funding will support the country's transition as well as encourage economic and sector reforms and sustainable development.
Kommentar(e)
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Sektor(en)
- Stadtentwicklung - Baugewerbe/Bau
- Energie - Energieversorgung
- Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen
- Müllbeseitigung - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen
Garantie im Rahmen des Außenmandats
This operation is covered by the ELM Guarantee.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 406 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 800 million
Umweltaspekte
The operation will focus on urban infrastructure projects with limited negative environmental impacts. Environmental pre-screening of the projects, including connection infrastructure where applicable, will be required. Ex-ante approval of the allocations by the Bank will be required to ensure compliance with the Bank's environmental and social standards including those on emission performance standards and those on the protection of sites of nature conservation, where applicable.
Auftragsvergabe
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Projektstatus
Unterzeichnet - 23/07/2015