Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20110594
Veröffentlichungsdatum: 12 September 2012

Projektträger – zwischengeschaltetes Finanzinstitut

PROVINCIA AUTONOMA DI TRENTO

Ort

Beschreibung

Financing of public infrastructure investments promoted by the Province of Trento

Ziele

The infrastructure schemes aim at improving municipal infrastructure, including municipal roads, schools, kindergartens and other social infrastructure and thus improve the quality of life of the residents of the Province. It is also expected that the investments will support the long-term economic growth of the Province.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 170 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 342 million

Umweltaspekte

The project is a multi-sector multi-scheme operation classified as a Framework Loan. Some of the schemes may eventually fall under Annex I or Annex II of the EIA Directive 2011/92/EU. Should any scheme have a negative impact on an area forming part of the Natura 2000 network or similar (falling under Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC), the Bank would require the promoter to act according to the provisions of the aforementioned Directives as transposed into national law. It will be required that all the schemes will be implemented in compliance with the EU environmental legislation.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EEC/ or 2004/17/EEC and Dir 2007/66/EC), with publication of tender notices in the EU Official Journal as and where appropriate. Projects with values below the EU thresholds will be procured according to the provisions laid down in national legislation. Details are to be reviewed by the Bank’s services during appraisal.

Projektstatus

Unterzeichnet - 23/11/2012

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Stadtentwicklung