Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20110608
Veröffentlichungsdatum: 29 Oktober 2012

Projektträger – zwischengeschaltetes Finanzinstitut

STORSTOCKHOLMS LOKALTRAFIK AB

Ort

Beschreibung

Replacement of the existing signalling system of the metro's Red Line with communications-based train control, associated upgrading of existing rolling stock and acquisition of new vehicles, construction of a new underground depot in Norsborg, and upgrading of the existing Nyboda depot in order to service the new and upgraded rolling stock.

Ziele

The project will increase the public transport service by increasing the capacity of Stockholm’s underground. The project shall contribute to maintaining public transport competitiveness and attractiveness, thus preventing a modal shift towards private transport.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

SEK 5800 million (EUR 634 million)

Gesamtkosten (voraussichtlicher Betrag)

SEK 11655 million (EUR 1274 million)

Umweltaspekte

The construction of the new depot falls under Annex II of the EU Environmental Impact Assessment (EIA) Directive, according to which the need for a full EIA is decided on a case-by-case analysis by the competent authority. The replacement of the signaling system and the upgrading of the existing depots also fall outside the scope of Directive 2011/92/EU. Compliance of project components, in particular of the new depot, with EU Directives on the environment, including the EIA Directive 2011/92/EU, the Habitats Directive 92/43/EEC and the Birds Directive 79/409/EEC, will be analysed during appraisal. The question of the project falling within a plan or a programme requiring a Strategic Environmental Assessment (SEA) in line with the EU Directive 2001/42/EC will also be examined during appraisal.

Auftragsvergabe

The promoter is subject to and follows public procurement rules according to EU regulations. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EEC, 2004/17/EEC and 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Projektstatus

Unterzeichnet - 15/02/2013

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Schweden Verkehr