Referenz: 20110652
Veröffentlichungsdatum: 8 Februar 2017

Projektträger – zwischengeschaltetes Finanzinstitut

OSHC BARKI TOJIK

Ort

Beschreibung

The project involves the rehabilitation of the hydro-mechanical and electro-mechanical equipment at the Kairakkum hydro power plant, including the replacement of all turbines and dam safety improvements.

Ziele

The rehabilitation project is expected to increase the efficiency, total capacity and total annual generation of the power plant, therefore improving the security and reliability of electricity supply in northern Tajikistan. The project is also intended to raise the safety level of the power plant, the dam and the reservoir while strengthening the resilience of the plant against the adverse effects of climate change.

Sektor(en)

Garantie im Rahmen des Außenmandats

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 50 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 198 million

Umweltaspekte

The technical assistance provided to the project included an environmental and social impact assessment carried out by a consultant. The planned rehabilitation works do not affect the water ways and are expected to have limited negative environmental and social impact, mainly relating to refurbishment and construction works, which can be mitigated by using appropriate working practices. The project encompasses some positive impact related to increased safety and climate change adaptation. During appraisal the Bank will review the environmental and social process and documentation to ensure alignment with Bank requirements.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project is done in accordance with the Bank's Guide to Procurement.

Projektstatus

Unterzeichnet - 24/05/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Tadschikistan Energie