Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20120042
Veröffentlichungsdatum: 18 Mai 2015

Projektträger – zwischengeschaltetes Finanzinstitut

ELISA OYJ

Ort

Beschreibung

The project entails large scale roll-out of the promoter’s 4th generation (4G) LTE mobile networks in Finland and Estonia as well as expansion of the 3rd generation (3G) HSPA networks to cover the remaining most rural areas of the countries. The project also includes the promoter’s investments to strengthen the backhaul and transmission networks to cope with the increasing data traffic, as well as investments into IT systems to improve overall quality of service.

Ziele

Improve quality and availability of mobile services both in urban and rural areas, positively contributing to the promoter's competitiveness and improving access to consumers.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 150 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 306 million

Umweltaspekte

The installation of mobile telecommunication networks do not fall under Annexes I and II of the EU Directive 2011/92/EC, and are therefore not subject to mandatory Environmental Impact Assessment. Such mobile telecommunication networks have limited residual environmental effects, apart from the visual impact of base station towers and the Electro Magnetic Field (EMF) radiation. Generally the impacts can be mitigated by appropriate construction and operation measures. Potential health risks from EMF radiation are still being studied at an international level, but in 2011 the WHO/International Agency for Research on Cancer (IARC) has classified such radiations as possibly carcinogenic to humans (Group 2B). There is no particular negative residual environmental impact expected.

Nevertheless full environmental details including the CO2 footprint (if needed) and the possible impacts on protected flora and fauna (Habitats 92/43/EEC and Birds 79/409/EEC Directives) will be assessed during the appraisal.

Auftragsvergabe

The promoter is a private company not operating in the utilities sector and not having a status of a contracting authority. Thus, it is not covered by the EU directives on procurement.

Projektstatus

Unterzeichnet - 6/10/2015

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Finnland Estland Telekommunikation