Veröffentlichungsdatum: 12 September 2013
Projektträger – zwischengeschaltetes Finanzinstitut
Aeroportos de Moçambique E.P. is a 100% State owned company operating 20 commercial airports in Mozambique. It owns and operates airport infrastructure all over Mozambique. ADM is in charge of investment and operations for air navigation in Mozambique, as well as the operation of the commercial airports.Ort
Beschreibung
Rehabilitation of runway and taxiway pavements, as well as the upgrade of the airfield lighting system at Maputo Airport in Mozambique.
Ziele
The project comprises the rehabilitation of the airside infrastructure at Maputo airport, which presents a real and on-going safety hazard to aircraft operations. The project will ensure the continued safe operation of the airport. The project will primarily focus on the rehabilitation of the runways, taxiways, aprons and the airfield ground lighting, as well as the drainage and other electrical works including the hydrant systems.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 20 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 55 million
Umweltaspekte
While the works primarily involve the rehabilitation of existing pavements within the existing airport boundary, and hence there are expected to be no significant impacts, the Bank will ensure during appraisal that the principles of the EU EIA Directive are observed in assessing what the level of impact might be. The design consultant is to prepare an initial environmental and social assessment followed by a full assessment if required.
Auftragsvergabe
The promoter will be required to implement the project in accordance with AFD procurement rules and procedures, and in compliance with the requirements and standards agreed between EIB, AFD and KfW for projects under the Mutual Reliance Initiative for operations outside the EU, as foreseen in the Bank’s Guide to Procurement. In particular, calls for international tenders will be published in the OJEU in accordance with the Bank's Guide to Procurement
Projektstatus
Unterzeichnet - 14/07/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).