Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20120159
    Veröffentlichungsdatum: 24 Juli 2012

    Projektträger – zwischengeschaltetes Finanzinstitut

    Government of the Territory of French Polynesia

    Ort

    Beschreibung

    Investment loan to the Government of the Overseas Territory French Polynesia with a maturity of up to 15 years for the implementation of a new seawater air-conditioning system (SWAC) for the Centre Hospitalier de Polynésie Française (CHPF) to reduce high-cost electricity consumption and emissions of greenhouse gases. The investment loan will be provided to the Government of French Polynesia for onlending to the Centre Hospitalier de la Polynésie Française.

    Ziele

    The project will contribute to realising French Polynesia's objectives of increasing the share of renewable energy to 50% in 2020, and 100% in 2030. While air-conditioning represents 40% of electricity consumption in French Polynesia, the Centre Hospitalier de Polynésie Française consumes 50% of its electricity for operating its air-conditioning system. Through a considerable reduction of its operating cost by decreased electricity expenses, the project will contribute to safeguarding the provision of sustainable health and hospital services.

    Kommentar(e)

    This operation is proposed as a co-financing agreement with Agence Française de Développement (AFD) and other co-financiers under the Mutual Reliance Initiate. It is agreed that AFD shall act as Lead Financier for the purposes of the Operational Guidelines.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 8 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 25 million

    Umweltaspekte

    The project falls under the EIA Act 2003 requiring a full Environmental Impact Assessment. It is assumed that the project will not have significant negative environmental impacts. It is rather anticipated that the overall impact on the environment is beneficial in the sense that it will result in reducing emissions from substituted thermal power generation. These assumptions are expected to be confirmed by the EIA process that has just been initiated under the management of AFD.

    Auftragsvergabe

    The procurement of the project will be managed by AFD, Lead Financier under this MRI operation. AFD will require the promoter to ensure that implementation of the project will be done in accordance with AFD's own procurement rules and the Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 28/12/2012

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Französisch-Polynesien Energie