Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20120165
Veröffentlichungsdatum: 20 Mai 2014

Projektträger – zwischengeschaltetes Finanzinstitut

The project promoter is the Slovak National Highway Company: Narodna dialnicna spolocnost, a. s.(NDS). NDS is the responsible authority for the development of motorways and expressways in Slovakia. The company is fully owned and managed by the Ministry of Transport, Construction and Regional Development. NDS staff will oversee the administration of the works and supervision of contracts. After construction, the motorway will remain the property of the Slovak Republic.

Ort

Beschreibung

The project consists of the construction of a new 18.5 km section of the D1 motorway between Jánovce and Jablonov in Slovakia. The project lies on the TEN-T Core Network Corridor. The project has been submitted for allocation of the corresponding EIB loan approved within the NDP Framework Loan (CA 09/595).

Ziele

The D1 motorway, once fully complete, will connect in an east-west orientation from Bratislava via Žilina, Prešov, Košice and the Slovakia/Ukraine border. The project is identified on the TEN-T core road network and is part of the Rhine-Danube core network corridor

Kommentar(e)

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 70 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 220 million

Umweltaspekte

The project was included in the Operational Transport Programme 2007-2013 for Slovakia, which falls within the scope of the strategic environmental assessment Directive 2001/42/EC. The project is a class of development that is included under Annex I of the Environmental Impact Assessment Directive 2011/92/EU and subject to full procedure. No Natura 2000 site, as defined under Directives 2009/147/EC (birds) and 92/43/EEC (habitats), is directly crossed. Environment and nature conservation decisions have been issued by the national competent authorities.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Genehmigt - 25/07/2014

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Slowakei Verkehr