Referenz: 20120194
Veröffentlichungsdatum: 31 Mai 2012

Projektträger – zwischengeschaltetes Finanzinstitut

The Promoter is the General Directorate of National Roads and Motorways (GDDKiA), the body responsible for the construction, maintenance and operation of the national road network throughout Poland.

Ort

Beschreibung

Improvement of 12 km of the Powazkowska-Marka section and construction of 16 km of the Salomeo-Wolica section of the Warsaw Ring Road and related arterial connections

Ziele

Improving traffic flows on part of a Trans-European Network in a convergence regions.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 300 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 821 million

Umweltaspekte

The Powazkowska and Marki improvement falls under Annex II of EIA Directive 2011/92/EU and was screened in. The section Salomea and Wolica falls under Annex I of the same Directive. Both sections were therefore subject to a full EIA procedure. The project has the potential to impact two Natura 2000 sites; so the provisions of the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) apply. The project sections are included in the Masovian Region Development Strategy to 2020, the National Road Construction Program 2008-2012 and the Operational Program Infrastructure and Environment, 2007-2013, all of which were subject to a form of strategic environmental assessment.The procedures and outcomes are to be further reviewed during appraisal.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Projektstatus

Unterzeichnet - 9/10/2012

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Verkehr