Veröffentlichungsdatum: 3 August 2012
Projektträger – zwischengeschaltetes Finanzinstitut
Syndicat Mixte des Transports en Commun de l'AgglomérationGrenobloise (SMTC Grenoble)Ort
Beschreibung
The project consists of the construction of a fifthtramway line (line E) connecting Grenoble to its suburb ofFontanil-Cornillon (north-west).
Ziele
Line E is the main plank of the Urban Transport Plan and forms part of apolicy of sustainable urban development in the greater Grenoble area.This large-scale project in the Grenoble conurbation addresses two basic issues:- it improves public transport access to greater Grenoble from the Voreppe valley in the north;- it strengthens the coordination between public transport provision and the urban development of the districts served.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 145 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 290 million
Umweltaspekte
The project comes under Annex II to the Directive 2011/92/EU, so the need to conduct an environmental impact assessment (EIA) is determined by criteria laid down by the Member States. According to French legislation, the project is subject to an impact assessment. The project obtained a favourable opinion from the environmental authority and was declared as being in the public interest in September 2011. All environmental aspects will be examined in greater detail during the final project appraisal.
Auftragsvergabe
As a public entity, SMTC must comply with public procurement procedures under French law resulting from the transposition of Community directives. The Bank will require the promoter to ensure that the contracts for the implementation of the project have been/are awarded in accordance with current EU legislation.
Projektstatus
Unterzeichnet - 28/10/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).