Veröffentlichungsdatum: 10 Juli 2013
Projektträger – zwischengeschaltetes Finanzinstitut
JAZZTEL PLCOrt
Beschreibung
The project concerns the roll-out of a telecommunication access infrastructure based on optical fibres to individual households (Fibre-To-The-Home / FTTH).
Ziele
The project includes the roll-out of the fibre network, including the related investments in the backbone network and IT systems.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 150 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 590 million
Umweltaspekte
Investments in fixed telecommunications projects (mainly civil works for urban underground copper/fibre roll-out) do not fall under Annex I and II of Directive 2011/92/EC. The related works have typically limited residual environmental effects as they are carried out in urban areas as well as alongside roads.
Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).
Auftragsvergabe
The promoter is a private company not operating in the utilities sector and not having a status of a contracting authority. Thus, it is not covered by the EU directives on procurement.
Projektstatus
Unterzeichnet - 3/04/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).