Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20120673
Veröffentlichungsdatum: 24 Juli 2013

Projektträger – zwischengeschaltetes Finanzinstitut

MINISTRY OF TRANSPORT

Ort

Beschreibung

Construction of 5 sections of the S8 expressway from Warsaw to Bialystok

Ziele

The project is located in a Convergence region and is therefore eligible under Article 309(a). The project road is included in the current TEN-T and is proposed for inclusion in the TEN-T comprehensive (i.e. non-core) road network as part of the on-going Revision Guidelines to be approved by the Council and Parliament. The project is therefore also eligible under Article 309 (c) of the EC treaty. The project is expected to benefit from grant finance under the Operational Program Infrastructure and Environment in the next financing perspective. The consistency of the project with the policy for lending to the transport sector (Decision CA/452/11) depends on its economic profitability and will be confirmed during appraisal.

Kommentar(e)

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

PLN 680 million (EUR 163 million)

Gesamtkosten (voraussichtlicher Betrag)

PLN 1706 million (EUR 408 million)

Umweltaspekte

The project falls under Annex 1 of the Environmental Impact Assessment Directive 2011/92/EU and is the subject to a full EIA procedure. The provisions of the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) apply. None of the sections appear to cross the Natura 2000 areas but are close to the following protected zones Bagienna Dolina Narwi (PLB 200001) and Bagno Wizna (PLB 200005). During appraisal the impact of the project on the environment will be determined.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Projektstatus

Unterzeichnet - 17/12/2013

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Verkehr