Referenz: 20130098
Veröffentlichungsdatum: 1 August 2013

Projektträger – zwischengeschaltetes Finanzinstitut

RAILWAY PROCUREMENT AGENCY

Ort

Beschreibung

The project consists of a 5.6 km extension of the Dublin's LUAS light rail system including 13 additional stations, a new depot and the purchase of 10 additional trams. The project will allow the connection between the two existing LUAS red and green lines in the inner city centre.

Ziele

A connection between the two existing LUAS red and green lines in the inner city centre would be made. The project is expected to further increase the attractiveness of the public transport network, improving accessibility while optimising costs and ensuring a sound environmental performance.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 163 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 326 million

Umweltaspekte

The project falls under Annex II of the EU EIA Directive, according to which the need for a full EIA is decided either on a case-by-case basis by the Competent Authority or on pre-established criteria set by the Member State. In this case an Environmental Impact Assessment has been carried out including public consultation. Further details on the compliance of the project with EU Directives on the environment, including EIA Directive 2011/92/EU, SEA Directive 2001/42/EC, Habitats Directive 92/43/EEC and Birds Directive 79/409/EEC will be analysed during appraisal.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EC/ and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Projektstatus

Unterzeichnet - 3/03/2014

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Irland Verkehr