Veröffentlichungsdatum: 1 Oktober 2013
Projektträger – zwischengeschaltetes Finanzinstitut
EGYPTIAN ELECTRICITY HOLDING COMPANY (EEHC)Ort
Beschreibung
Conversion of existing Open Cycle Gas Turbine power plant to Combined Cycle Gas Turbine power plant in El Shabab, increasing generating capacity from 1000MW to 1500MW.
Ziele
The project employs modern, commercially proven, combined-cycle power generation technology to increase the output and fuel efficiency of an existing power plant project. It is expected to contribute to meeting the increasing electricity demand at a competitive cost, with relatively low environmental impact.
Kommentar(e)
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 205 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 413 million
Umweltaspekte
Due to its size and technical characteristics, the project is not required to follow an EIA procedure; however, the EIA for the existing open-cycle power plant, carried out in 2010, will be reviewed during appraisal and any significant gaps in the previous assessment, as well as any social or environmental concerns raised by the conversion to combined-cycle operation, will be required to be addressed by the promoter to the Bank's satisfaction.
Auftragsvergabe
The project will be required to be procured according to the Banks Guide to Procurement. The procurement process is ongoing.
Projektstatus
Unterzeichnet - 9/02/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).