Referenz: 20130638
Veröffentlichungsdatum: 5 Oktober 2015

Projektträger – zwischengeschaltetes Finanzinstitut

NATIONAL AUTHORITY FOR TUNNELS

Ort

Beschreibung

Purchase of additional rolling stock to improve services on line 2 of the Cairo metro, to alleviate traffic congestion and promote public transport in urban greater Cairo

Ziele

The project is fully in line with the strategic objectives set for the Bank's external lending mandate since it will ensure continuous operation of the metro, an important social and economic infrastructure supporting Cairo's urban development, and also contribute to climate change mitigation, as greenhouse gas emissions per passenger are much lower for metro trips than for car trips.

Kommentar(e)

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Sektor(en)

Garantie im Rahmen des Außenmandats

This operation is covered by the ELM Guarantee.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 75 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 187 million

Umweltaspekte

If the project were located in the EU, the acquisition of new rolling stock would fall outside the scope of the Environmental Impact Assessment (EIA) Directive (2011/92/EU, as amended), as its construction will take place in the manufacturer's plants. This also applies to the implementation, meaning no EIA is required for the project.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement. In particular, calls for international tenders will be published in the Official Journal of the European Union, in accordance with the Bank's Guide to Procurement. Procurement is expected to start in the second half of 2015.

Projektstatus

Unterzeichnet - 1/12/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Ägypten Verkehr