Referenz: 20140106
Veröffentlichungsdatum: 29 August 2014

Projektträger – zwischengeschaltetes Finanzinstitut

KYRGYZ REPUBLIC REPUBLIC OF TAJIKISTAN

Ort

Beschreibung

Construction of power-transmission infrastructure in Kyrgyzstan and Tajikistan. The proposed schemes form part of a larger regional project led by the World Bank and involving four Asian countries (Kyrgyzstan, Tajikistan, Afghanistan and Pakistan).

Ziele

The objective of the “Central Asia-South Asia Electricity Transmission and Trade Project” (“CASA-1000”) is to create the conditions for sustainable trade of renewable electricity (hydro) between the Central Asian countries of Tajikistan and Kyrgyzstan and the South Asian countries of Afghanistan and Pakistan, thus alleviating power supply shortages in the aforementioned South Asian countries and enhancing revenues in Tajikistan and Kyrgyzstan.

Sektor(en)

Garantie im Rahmen des Außenmandats

This operation is covered by the ELM Guarantee.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 149 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 334 million

Umweltaspekte

High voltage transmission lines require an EIA to be carried out.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank’s Guide to Procurement.

Projektstatus

Unterzeichnet - 23/12/2014

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Kirgisistan Tadschikistan Energie