Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20140120
Veröffentlichungsdatum: 17 Juni 2014

Projektträger – zwischengeschaltetes Finanzinstitut

The promoter, Zeleznicna spolocnost' Slovensko (ŽSSK), a 100% owned Slovakian National Railway operator, is known to the Bank through previous operations.

Ort

Beschreibung

The project is a major allocation under the structured programme loan "NDP FRAMEWORK LOAN II" and concerns the acquisition of nine Electric Multiple Units (EMU) and 20 Diesel Multiple Units (DMU) for Zeleznicna spolocnost' Slovensko (ZSSK). The European Commission's co-financing decision has been issued on 09/12/2013.

Ziele

The project is key to the investment programme of ZSSK and aims at modernising the rolling stock fleet within this segment, allowing integration of the public transport system of trams, buses and trains within the agglomerations of Bratislava and Kosice.

Kommentar(e)

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 26 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 167 million

Umweltaspekte

The project was included in the Operational Transport Programme 2007-2013 for Slovakia, which falls within the scope of the strategic environmental assessment Directive 2001/42/EC. The project is a class of development that is included under Annex I of the environmental impact assessment Directive 2011/92/EU and subject to full procedure. The project passes through a special protected area defined under the Birds Directive 2009/147/EC. Environment and nature conservation decisions have been issued by the national competent authorities.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Genehmigt - 25/07/2014

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Slowakei Verkehr